ŽOS Zvolen modernizes three assembly wagons for ŽSR

On 30 April, ŽSR and ŽOS Zvolen signed a contract for modernization of three assembly wagons of traction lines typed MVTV 02 at EUR 1.754 mill. excluding VAT. The first wagon should be modernized in 9 months including approval of the type (which is a significant change). Modernization of the remaining two wagons should last 5 months each.

 

source: 6.5.2015; own message